RESOLUTE MINING WKN: 794836 ISIN: AU000000RSG6 Kürzel: RSM Forum: Aktien Thema: Hauptdiskussion

0,2159 USD
-13,29 %-0,0331
16. Nov, 02:10:00 Uhr, Nasdaq OTC
Kommentare 1.795
K
Kgv2, 16.04.2019 5:58 Uhr
0
Wesentliches aus dem Report: Dividende "A dividend has not been declared for the six month period ended 31 December 2018 (which is a transitional six month reporting period as opposed to a full financial year). The company’s dividend policy of paying a minimum of 2% of sales as a dividend will continue based on a 31 December financial year going forward. On this basis, a dividend for the year ended 31 December 2019, if declared, would be paid in March 2020." Syama Update "Syama Gold Mine At the Syama Gold Mine in Mali (Syama) production in the six month period was 93,309oz at an AISC of A$1,244/oz (US$901/oz). The highlight of the reporting period was the successful commencement of long hole open stoping and sublevel caving at the Syama Underground Mine. First ore was delivered on time and on budget from the sublevel cave in December 2018 and marked a pivotal moment in the history of the Company. Sulphide Operations During the six month period ending December 2018, production from the Syama sulphide circuit was 37,256oz at an AISC of A$1,627/oz (US$1,178/oz). Gold recovery for the period was in *** with expectations as the Company treated mixed ore sources; underground ore was blended with low-grade ore stockpiles which had a direct impact on the recovery. All elements of Resolute’s sulphide processing improvement project, Project 85, have been commissioned and are operating effectively. Significantly, during periods when 100% underground sulphide ore was treated, the Syama processing plant delivered recoveries greater than 85% which provides confidence in Resolute’s ability to achieve targeted recoveries from Syama. The proportion of underground ore through the mill will increase over the first half of 2019 which will reduce the level of blending of underground ore with low grade stockpiles. The ramp-up of the Syama Underground Mine will enable an increasing proportion of mill feed to be higher grade underground ore which will drive greater gold production. From June 2019 onwards, underground sulphide ore will be treated exclusively through the sulphide plant. Oxide Operations During the six month period ending 31 December 2018, production was 56,053oz at an AISC of A$992/oz (US$718/oz). Oxide production was initially sourced from stockpiled ore from the northern satellite pits (A21, Alpha, Beta and BA01), located between 4km and 8km north of the Syama processing plant. Processing of ore sourced from the new Namakan satellite open pit at Tabakoroni, located 35km south of Syama, commenced in November 2018. Milling characteristics of ore from Tabakoroni were better than anticipated with larger quantities of fully oxidised ore resulting in higher throughput, while improved grades contributed to higher processing recoveries. Gold produced (poured) improved markedly with the introduction of higher grade oxide material from Tabakoroni. Commissioning of the gravity gold circuit was also successfully completed in conjunction with the commencement of treatment of the Tabakoroni material with an immediate positive impact. Tabakoroni will provide 100% of oxide mill feed at Syama in 2019. Ongoing Development at Syama Underground Having commenced production from the sublevel cave in December 2018, work is now focused on commissioning of the new automated fleet. When fully commissioned the autonomous mining operation will comprise automated long hole production drilling, automated loading and automated haulage from the underground loading station to the Run of Mine (ROM) pad above ground. In addition to lowering costs, automation will increase safety and productivity at Syama and create numerous highly skilled jobs in Mali for the life of the mine. Solar Hybrid Power Plant Development In November 2018, Resolute announced the signing of a Joint Development Agreement with Ignite Energy Projects Pty Ltd (Ignite Energy) for the development of a new 50 megawatt (MW) independent hybrid power plant at Syama which will combine solar, battery, and heavy fuel oil technologies. This innovative project is expected, when constructed, to be the world’s largest fully integrated hybrid power plant for a standalone mining operation. The new power plant will replace the existing historic 28MW diesel fired power station at Syama and is expected to be fully operational by the end of 2020. The new Syama power solution will be funded and constructed under an Independent Power Producer model whereby Ignite Energy, under the terms of an exclusive Power Purchase Agreement, will be responsible for the design, construction, ownership, funding, and operation of the new Solar Hybrid Power Facility on an exclusive basis and will supply power to Resolute on a guaranteed basis subject to a maximum tariff over a term of between 12 and 20 years."
K
Kgv2, 16.04.2019 5:17 Uhr
0
Annual report wurde heute Nacht veröffentlicht: https://hot.copper.com.au/documentdownload?id=uOMxKKzFkiWRTLKhOROKAxjvTDYD4Qm9yBWZsuR%2Bke92GA%3D%3D
K
Kgv2, 09.04.2019 5:21 Uhr
0
European Gold Forum Presentation https://hot.copper.com.au/documentdownload?id=uOMxKKzFkiWRTLKhOROKAxjvTDYD4Qi%2FyxeZsuR%2Bke92GA%3D%3D (Punkt bei hot.copper entfernen)
K
Kgv2, 08.04.2019 11:37 Uhr
0
Das stimmt, Tom!
K
Kgv2, 08.04.2019 10:43 Uhr
0
Gerne, Harry. Hoffen wir, dass mit den guten News jetzt der Knoten geplatzt ist und die Kursrallye bis Weihnachten starten kann 😊
Harry!
Harry!, 08.04.2019 9:55 Uhr
0
Danke Kgv2
K
Kgv2, 08.04.2019 9:35 Uhr
0
@Bertil - bei einem Stand von 1,20 sehen wir auch die 1,40 schnell wieder. Bei 1,40 gibts dann von mir einen 🚀jubelschrei 😀
B
Bertil3, 08.04.2019 9:32 Uhr
0
Ich verkneife mir das Jubeln bis wir 1,20 sehen
K
Kgv2, 08.04.2019 9:15 Uhr
0
Wenn Syama und Tabakorini auch im Juni Quartal gut liefern, geht es hier straight nach oben 😋
K
Kgv2, 08.04.2019 9:14 Uhr
0
April 8 (Reuters) - Resolute Mining Ltd (RSG) : MARCH QUARTER GOLD PRODUCTION 98,105OZ, UP 33% ON DECEMBER 2018 QUARTER SAYS ON TRACK FOR FY19 GUIDANCE TO 30 JUNE 2019 OF 300KOZ AT AISC OF A$1,280/OZ (US$960/OZ) KEY DRIVER OF POSITIVE QUARTERLY PERFORMANCE WAS HIGH GRADE AND ABOVE BUDGET RECOVERIES ACHIEVED FROM NEW MINE AT TABAKORONI Source text http://bit.ly/2I4zpR0 ((Reuters.Briefs@thomsonreuters.com;))
K
Kgv2, 08.04.2019 9:12 Uhr
0
Resolute hat geliefert mit top Zahlen 😊
Harry!
Harry!, 08.04.2019 8:13 Uhr
0
Was ist der Grund des Anstiegs ? Weiss jemand was ?
Polluxo
Polluxo, 08.04.2019 4:50 Uhr
0
Heute nach in Australien Mords Umsätze und über 8% plus weiter so 😂😂😂
K
Kgv2, 04.04.2019 17:37 Uhr
0
Bertil, das kommt jetzt wirklich auf den nächsten Geschäftsbericht an. Wenn der gut wird und Syama liefert, geht's wieder Richtung 1 Euro. Ansonsten geh ich mit Dir und es kommen nachkaufkurse...
B
Bertil3, 04.04.2019 13:35 Uhr
0
Kommen wieder die 60 kauf ich diesmal auch nach und bei 72 wieder raus damit
K
Kgv2, 29.03.2019 19:07 Uhr
0
Gerne doch, Maker 👍🏻
Meistdiskutiert
Thema
1 NVIDIA Hauptdiskussion +0,70 %
2 RENK (für normale, sachliche Kommunikation!) +0,27 %
3 Ripple Hauptdiskussion +29,78 %
4 DAX Hauptdiskussion +0,09 %
5 XRP zu USD Hauptdiskussion +30,67 %
6 MicroStrategy +0,43 %
7 Trading- und Aktien-Chat
8 ASML HOLDING Hauptdiskussion ±0,00 %
9 NEL ohne Spam ±0,00 %
10 Goldpreis Hauptdiskussion ±0,00 %
Alle Diskussionen
Aktien
Thema
1 NVIDIA Hauptdiskussion +0,70 %
2 RENK (für normale, sachliche Kommunikation!) +0,27 %
3 MicroStrategy +0,43 %
4 NEL ohne Spam ±0,00 %
5 ASML HOLDING Hauptdiskussion ±0,00 %
6 BioNTech Hauptdiskussion -0,08 %
7 FREYR BATTERY ±0,00 %
8 VIVOPOWER INTL. DL -,012 Hauptdiskussion -39,13 %
9 Nio für normale Kommunikation ±0,00 %
10 Lilium Aktie -42,62 %
Alle Diskussionen