GENEX POWER LTD. WKN: A14UK5 ISIN: AU000000GNX5 Forum: Aktien Thema: Hauptdiskussion

0,1685 EUR
+0,60 %+0,0010
22. Jul, 23:00:48 Uhr, Lang & Schwarz
Kommentare 44
D
Dilos, 27.04.2022 6:52 Uhr
0
Achso, laut aktuellem Quartalsbericht!
D
Dilos, 25.07.2022 8:01 Uhr
0
Übernahmeangebot zu 0,23$ pro Share. Von SEIF und Stonepeak, führte heute zu einem Preisanstieg um knapp 45% in Australien. Mal sehen wie sich Genex entscheidet.
R
R41NbL00D, 28.07.2022 12:18 Uhr
0
Wie sieht's hier aus ?
R
R41NbL00D, 28.07.2022 12:18 Uhr
0
Bleiben die oder werden die übernommen, hab noch nichts gehört
D
Dilos, 27.04.2022 6:52 Uhr
0
Alle Projekte "on schedule " und rund 62 Mio$ in Cash. Die Firma wird noch Spaß machen.
D
Dilos, 21.01.2022 7:04 Uhr
0
Genex Power Limited (ASX: GNX) (Genex or the Company) is pleased to provide the following construction update for the 250MW Kidston Pumped Storage Hydro Project (K2-Hydro or the Project). . COMMENCEMENT OF UNDERGROUND WORKS – MAIN ACCESS TUNNEL During December 2021 and January 2022 (the Period) extensive works relating to the Main Access Tunnel (MAT) for the Project have been undertaken. The commencement of the MAT is ahead of the contract schedule and progressing well. The MAT makes up a 1.5km long horseshoe profile having dimensions of approximately 6m wide and 6m high. It is graded at 14% (1:7) in a spiral to access the powerhouse cavern which is approximately 250m below ground level. The powerhouse cavern will house the two 125MW Andritz Hydro reversible pump- turbines. The MAT is constructed using conventional full-face drill and blast excavation methodology, with a single heading taking approximately 6 months to reach the first adit which will provide first access to the powerhouse cavern. Once the first adit is reached, multiple tunnel headings will progress to expedite the powerhouse cavern excavation. With preparation works for the MAT completed in early 2022 including portal face stabilisation and preparation works, the EPC Contractor joint venture for the Project have formally commenced the underground excavation works with the first major blast for the MAT. Following this milestone, tunnelling operations are now progressing on a 24/7 basis with two shifts per day, which is scheduled to progress the tunnelling works at an average rate of 8m per day over the next 6 months.
D
Dilf333, 14.01.2022 16:57 Uhr
0
Vor 7 Std. Veröffentlicht
D
Dilf333, 14.01.2022 16:55 Uhr
0
Hier der Artikel mit der deutschen Übersetzung wo RWE Genex power erwähnt In einer Jahresendmitteilung hat RWE eine kleine Energiespeicher-Pilotanlage mit einer Kapazität von 4,5 MWh auf Basis von 60 Audi BEV-Batterien, die das Ende ihrer Lebensdauer als BEV-Batterien erreicht haben, in einem Pumpspeicherkraftwerk angekündigt. Dies spiegelt eine kürzliche Entscheidung von Genex Power (ASX:GNX) wider, ein großes Tesla-Batteriespeichersystem zu integrieren, um die Stromflüsse an ihrem Pumpwasser-/Solar-PV- und wahrscheinlich Windkraftstandort in Nord-Queensland zu verwalten
D
Dilf333, 14.01.2022 16:54 Uhr
0
https://www.google.de/amp/s/seekingalpha.com/amp/article/4479610-rwe-aktiengesellschaft-stock-offshore-wind-old-bev-batteries-storage
D
Dilos, 05.01.2022 9:05 Uhr
1
Ja, vor allem für Trader wegen des mitunter hohen Spreads sehr uninteressant. Daher ist es hier im Forum auch sehr ruhig. Ich für meinen Teil bin hier aber sehr gespannt und zuversichtlich. Bisher läuft hier alles wie geplant und Fortschritt ist ersichtlich.
D
Dilf333, 05.01.2022 8:53 Uhr
0
Hallo die Aktie scheint noch ziemlich unbekannt zu sein. Bin aber drin.🚩
D
Dilos, 23.12.2021 8:53 Uhr
0
Genex Power Limited (ASX:GNX) (Genex or Company) is pleased to announce that it has entered into a binding Bi-directional Service Provider Connection and Access Agreement (the Agreement) with Powerlink Queensland (Powerlink) for the 50MW/100MWh Bouldercombe Battery Project (BBP or the Project) located in central Queensland. The Agreement, which was entered into by Genex’s wholly-owned subsidiary Bouldercombe Battery Project Co Pty Ltd as Trustee for Bouldercombe Battery Project Trust, allows for the connection of the Project into the National Electricity Market (NEM) via Powerlink’s network. The connection point will be located at the existing 132kV/275kV Bouldercombe Substation, adjacent to the Project. The close proximity of the Project to the Bouldercombe Substation has resulted in significant cost savings associated with the connection assets as well as a decrease in energy losses between the Project and the point of connection. The execution of the Agreement means the Project is now classified as a committed generator, with its position secured within the NEM. Being confirmed as a ‘committed generator’ enables the Company to now focus its attention on the remaining activities associated with achieving financial close for the Project.
D
Dilos, 09.12.2021 7:43 Uhr
0
GENEX unterschreibt Autobidder offtake agreement mit Tesla für das Bouldercombe Batterie Projekt
D
Dilos, 15.11.2021 7:06 Uhr
0
The 50MW Kidston Solar Project KS1, our first operating asset, located at our Kidston Clean Energy Hub in north Queensland, continued to perform well across the year, generating clean renewable energy into the NEM. The project delivered $10.6M in net revenue over the course of FY21. The 50MW/100MWh Bouldercombe Battery Project Genex’s Bouldercombe Battery Project (BBP) in Queensland continues to progress. Subsequent to the end of the 2021 financial year we announced a Supply Agreement with Tesla Motors Australia Pty Ltd (Tesla). The Project will utilise Tesla’s Megapack lithium-ion battery technology, an all-in-one utility- scale energy storage system. The 50MW/100MWh battery will comprise 40 Megapacks. Genex is continuing to fast track the development of the project. With a construction timeline of approximately 12 months, it is anticipated the BBP should begin commissioning in the second quarter of calendar year 2023 and be fully operational in the third quarter of calendar year 2023. The BBP diversifies the Company’s portfolio and further positions Genex as a leader in renewable energy generation and storage in Australia. The Kidston Wind Project Further diversifying the project portfolio, the Kidston Wind Project (K3-Wind) continues to advance with the Company, and our joint venture partner J-POWER, modelling the wind resource at a number of sites surrounding the Kidston Clean Energy Hub. Energy generated by K3-Wind will flow into the NEM via the new 275kV transmission line being constructed by Powerlink Queensland as part of the K2- Hydro project. The project is planned for completion in mid calendar year 2025. Corporate During FY21 the Company undertook two equity raisings to help progress the development of our portfolio of renewable energy generation and storage assets. In August 2020, we successfully raised $21.3M via a placement of shares to both existing and new sophisticated and institutional shareholders, coupled with a further $2.85M raised by a Share Purchase Plan. This raising helped to fast track the BBP, fund financial close costs at K2-Hydro and provide working capital. In March 2021, the Company raised a further $90M via an institutional placement and an 11-for-20 fully underwritten pro-rata accelerated non-renounceable entitlement offer. These proceeds completed the funding of the K2-Hydro project. J-POWER Investment Following approval at the Extraordinary General Meeting of Genex shareholders (EGM) held on 29th April 2021, J-POWER became a substantial shareholder in the Company with their $25M investment into Genex. J-POWER is providing valuable technical expertise to the K2-Hydro project.We have further extended our relationship with J-POWER by Genex and J-POWER becoming JV partners for the K3-Wind Project. The strategic relationship between our companies, and J-POWER’s direct investment, has resulted in the appointment of a J-POWER representative to the Genex Board of Directors, Kenichi Seshimo, who we welcomed to the Board in May this year. Ongoing support from our key Stakeholders I would like to acknowledge the ongoing strong support Genex has received from a number of Federal and Queensland State Government entities. The Australian Renewable Energy Agency (ARENA) continues to support Genex via the provision of grants towards our projects. In particular, we recognise the Northern Australia Infrastructure Facility (NAIF) and their investment decision to offer finance to K2-Hydro, which was pivotal in enabling Genex to reach financial close for K2-Hydro.
D
Dilos, 15.11.2021 7:04 Uhr
0
Zusammenfassung der Hauptversammlung: Company Activities Brief Overview Calendar year 2021 has been a landmark year for the Company as we energised the 50MW Jemalong Solar Project (JSP) and commenced construction on our flagship Kidston Pumped Storage Hydro Project (K2-Hydro). The development of these projects, coupled with our existing 50MW Kidston Solar Project (KS1) and extensive growth portfolio, position the Company as a leader in renewable energy generation and storage markets in Australia. By 2025, our portfolio of renewable energy projects will provide clean energy to meet the needs of over 350,000 homes, removing almost two million tonnes per annum of carbon dioxide from our country’s emission profile. Our Queensland projects will also contribute significantly in assisting the Queensland Government meet its 50% renewable energy target by 2030. The 250MW Kidston Pumped Storage Hydro Project The K2-Hydro Project reached financial close in May this year. Genex has been working towards this important milestone for over five years, and I would like to thank all of our stakeholders for their support as well as the team at Genex for their tireless work in reaching this significant event. K2-Hydro is now fully funded through to completion with commissioning planned to begin in late CY24. Construction activities are now well underway, and we will be working closely with our team of quality partners over the next 3 years to deliver this icon project on time and on budget. Just a reminder that the Kidston Pumped Storage Hydro project provides 2000MWh of energy storage for the National Electricity Market (NEM). The 50MW Jemalong Solar Project The energisation of the 50MW Jemalong Solar Project in December 2020 represented our second revenue earning renewable energy project and further demonstrated our track record of project delivery. JSP is located near Forbes in central NSW and is now fully commissioned and operating as a merchant generator connected to the NEM. JSP is expected to deliver a significant step change in the Company’s revenue from FY22 onwards.
Meistdiskutiert
Thema
1 BED BATH & BEYOND Hauptdiskussion ±0,00 %
2 DEUTZ Hauptdiskussion +1,63 %
3 DRONESHIELD LTD Hauptdiskussion -4,21 %
4 MicroStrategy +8,02 %
5 Hexagon Purus -15,15 %
6 BASF Hauptdiskussion +3,60 %
7 SUNHYDROGEN -0,40 %
8 TELADOC HEALTH INC.DL-001 Hauptdiskussion +4,15 %
9 DPCM Capital Hauptdiskussion +5,38 %
10 Hauptforum Everfuel -3,93 %
Alle Diskussionen
Aktien
Thema
1 BED BATH & BEYOND Hauptdiskussion ±0,00 %
2 DEUTZ Hauptdiskussion +1,63 %
3 DRONESHIELD LTD Hauptdiskussion -4,21 %
4 MicroStrategy +8,02 %
5 Hexagon Purus -15,15 %
6 BASF Hauptdiskussion +3,60 %
7 SUNHYDROGEN -0,40 %
8 TELADOC HEALTH INC.DL-001 Hauptdiskussion +4,15 %
9 DPCM Capital Hauptdiskussion +5,38 %
10 Hauptforum Everfuel -3,93 %
Alle Diskussionen