Drei Kräfte kommen zusammen
Warum dies die wichtigste Kupfer-Story des Jahres 2024 sein könnte
Anzeige
ANSON RESOURCES WKN: A2AC6W ISIN: AU000000ASN8 Kürzel: 9MY Forum: Aktien Thema: Hauptdiskussion
0,03985 EUR
±0,00 %±0,00000
17. Nov, 16:49:13 Uhr,
Lang & Schwarz
Kommentare 2.339
Di2,
01.08.2023 18:01 Uhr
0
Brruce ist im September Speaker bei
https://benchmarkevents.benchmarkminerals.com/gigaapac
Di2,
01.08.2023 7:25 Uhr
1
Das gesamte Genehmigungsverfahren ist sehr langwierig und wird noch Monate dauern.
1) Land/lease acquisitions for both plants ✅️
2) Water rights for both plants ✅️
3) Air quality permits for both plants ✅️
Di2,
01.08.2023 7:15 Uhr
0
“The emission exception is an extremely significant approval, as securing a small source emissions exemption at state level from the Utah Department of Environmental Quality means that the company will not be required to seek any further air quality permits from the Federal EPA.
“Anson has designed the Paradox Project to extract, transport, process and dispose of lithium-bearing brine on state or private areas.
“This will likely have a positive impact on the proposed timeline to production, as the Government of Utah is supportive of the project and its approval timeline is expected to be comparatively shorter than federal government approval.
Di2,
01.08.2023 7:13 Uhr
0
Anson Resources Ltd (ASX:ASN) has been granted a small source emissions exemption by the State of Utah’s Department of Environmental Quality for its Paradox Lithium Project in the USA, a huge win for being committed to environmental, social and governance (ESG) principles in its business conduct.
The approval exempts Paradox from being subjected to the federal government’s Environmental Protection Agency (EPA) supervision or oversight, which means that the project could go into production quicker than expected.
This permit is a key requirement for full-scale processing and securing it is consistent with Anson's aim of developing Paradox into a sustainable lithium-producing operation with minimal impact on the environment.
Di2,
27.07.2023 10:08 Uhr
0
Hier sieht man das überarbeitete BLM Genehmigungsverfahren. Teilweise sind die Einwände weit hergeholt ;)
https://hotcopper.com.au/threads/asn-general-discussion.6542018/page-13403?post_id=69009659
Di2,
27.07.2023 7:48 Uhr
0
https://hotcopper.com.au/attachments/5468175/?filename=Hotbrine+Bling.pdf
Unser Nachbar MAN schmeißt die PR Maschine an ;)
Di2,
23.07.2023 22:59 Uhr
0
DLE vs. Ponds
https://hotcopper.com.au/threads/asn-general-discussion.6542018/page-13306?post_id=68934091
Di2,
23.07.2023 19:59 Uhr
0
Die Lithium Hardrock Fraktion wird aufgrund der immer näher rückenden DLE Technologie merklich nervös und schießt aus allen (verbalen) Kanonen;)
https://www.livewiremarkets.com/wires/where-the-fundies-have-lithium-all-wrong?utm_campaign=&utm_medium=wire-page-share&utm_source=linkedin&utm_content=where-the-fundies-have-lithium-all-wrong
Di2,
18.07.2023 12:06 Uhr
0
Quelle HC:
This acquisition is brilliant...fills in whats left of the jigsaw puzzle resulting in:
an immediate upgrade of the resource
brine reservoirs already known to ASN
availability of existing wells for re-entry including the drill already before BLM
avoids the huge amount of time and effort resultant from reservoir and production allocation with Strategic Lithium. Believe me having been in the oil and gas industry with shared reservoirs the amount of wasted effort and time with presentations, meetings, communications, arguments with adjoining contracts would have been enormous and
more efficient use of infrastructure across the whole land holding.
Di2,
18.07.2023 8:51 Uhr
0
Das heutige Announcement wurde über 11.000 mal angesehen und war mit aktuell 120 Upvotes der meist gehypte Bericht bei Hotcopper.
Das zeigt, daß ASN nach wie vor stark im Fokus der Anleger ist und wir weiter auf das entscheidende Announcement warten müssen.
Di2,
18.07.2023 6:38 Uhr
2
https://stockhead.com.au/resources/anson-eyes-resource-upgrade-off-the-back-off-strategic-lithium-project-acquisition-next-door-to-paradox/
Anson Resources has entered into an agreement to purchase the strategically located Green Energy lithium brine project from Legacy Lithium Corp in the Paradox Basin in south-eastern Utah, USA.
The proposed acquisition consideration is US$1 million in cash and 15,060,981 ordinary shares in the company.
Di2,
09.07.2023 10:22 Uhr
0
Falls sich jemand fragt was FEED bedeutet:
FEED (Front End Engineering Design)
FEED (Front End Engineering Design) means Basic Engineering which is conducted after completion of Conceptual Design or Feasibility Study. At this stage, before start of EPC (Engineering, Procurement and Construction), various studies take place to figure out technical issues and estimate rough investment cost. This work is normally contracted to EPC contractors such as Chiyoda, as an optional contract or through bidding. The product of the activity is called “FEED Package” which amounts up to dozens of files and will be the basis of bidding for EPC Contract.
It is important to reflect client’s intentions and project specific requirements in to the FEED Package without fail, in order to avoid significant change during EPC Phase. The FEED Work takes about 1 year in case of a large-sized project such an LNG plant. As it is essential to maintain close communication with client, it is a common practice that client stations at Contractor’s office during the work execution.
Di2,
08.07.2023 8:54 Uhr
0
Der Post fast die Lage ganz gut zusammen:
Whilst the silence from the company is deafening, remembers Fat Bastard's phiosophy:
(yes, that's the Mike Meyer's Fat Bastard!)
First things First
One thing leads to another
What's done is done
It is what it is
Let's see how these apply tp ASN.
First Things First
In the May 2023 interview on Proactive,Bruce said that financiers wanted a FEED study and that would need 6 months- so that puts us to NOV/DEC and it is this that made the time line redundant,
One thing leads to another
Hopefully after the FEED we will be able to enter more meaningful for finance and or equity contributions by off -takers.,,,so this may lead to off take agreements
What's Done is Done
The timeline was constructed under different market conditions where money was more easy to come by.Things are tougher now and much is outside the company's control.
It is what it is.
We were in anticipation for events to unfold according to the timeline- but it is what it is and hopefully our patience will be rewarded.
In the meantime ,while we wait. My wish list includes:
a resource upgrade from reentry assays
a diamond drill deep into the heart of the bull
monetarization the the uranium/cobalt resource to fund our equity contribution for the Li project.
Di2,
05.07.2023 11:39 Uhr
0
Wenn du die Gemeinsamkeiten von ASN und LKE auf eine Grafik beschränkst gebe ich dir recht.
bremis,
30.06.2023 23:42 Uhr
0
Na ja vom 1 Jahres hoch, ist leider auch nichts mehr übrig geblieben, genauso wie bei Lake, viel Unterschiede nicht zu erkennen. Überall wird es teurer und verzögert sich, jedoch wird Lithium weiterhin über Jahre benötigt, es dauert halt doch etwas länger wie geplant, auch hier, Long, Long halt.
Di2,
30.06.2023 10:36 Uhr
0
Im Juni war der Abverkauf ziemlich hoch. Das liegt u.a. am Ende des australischen Geschäftsjahres (06/2023)...einige realisieren Verluste/Gewinne und steigen zu einem späteren Zeitpunkt wieder ein
Ich geh davon aus, dass wir in Q4 die relevanten Announcements sehen werden
Meistdiskutiert
|
Thema | ||
---|---|---|---|
1 | Trading- und Aktien-Chat | ||
2 | für alle, die es ehrlich meinen beim Traden. | ||
3 | BLOOM ENERGY A Hauptdiskussion | ±0,00 % | |
4 | GAMESTOP Hauptdiskussion | +0,56 % | |
5 | Das neue Dax Prognose Forum | +0,09 % | |
6 | VITAL THERAPIES Hauptdiskussion | -0,99 % | |
7 | MicroStrategy | ±0,00 % | |
8 | Phunware Hauptdiskussion | -5,29 % | |
9 | MODERNA INC. DL-,0001 Hauptdiskussion | +0,63 % | |
10 | BAYER Hauptdiskussion | ±0,00 % | Alle Diskussionen |
Aktien
|
Thema | ||
---|---|---|---|
1 | BLOOM ENERGY A Hauptdiskussion | ±0,00 % | |
2 | GAMESTOP Hauptdiskussion | +0,56 % | |
3 | VITAL THERAPIES Hauptdiskussion | -0,99 % | |
4 | MicroStrategy | ±0,00 % | |
5 | Phunware Hauptdiskussion | -5,29 % | |
6 | BAYER Hauptdiskussion | ±0,00 % | |
7 | BED BATH & BEYOND Hauptdiskussion | ±0,00 % | |
8 | MODERNA INC. DL-,0001 Hauptdiskussion | +0,63 % | |
9 | ASML HOLDING Hauptdiskussion | ±0,00 % | |
10 | EVOTEC Hauptdiskussion | ±0,00 % | Alle Diskussionen |